Last week the Forest Lake Area Trail System steering committee met with architects from the Department of Natural Resources, and a representative from the National Park Service. We walked through what will be Phase 1 in the spring. That was easy, there is only one place where there will be a bridge and it was easy to walk around. Then we walked through what might be Phase 2. That was a little more challenging because if that is the route, there will need to be at least one bridge and cut-throughs of two berms.